"The City is not responsible to prove the legal status of the nonconformity." That sentence is in Chapter 9.290 of Cathedral City's Council Public Hearing Draft Development Code, the October 2026 document the City Council takes up at public hearings on October 14 and October 28, 2026. The Planning Commission discussed the draft on September 9 and September 23 and sent a recommendation to the Council.

The draft says any lawfully established use, structure or parcel that exists on the code's effective date but doesn't meet the new standards "shall be considered nonconforming." New standards produce new nonconformities. A Cathedral City home can take on that status on the day the code takes effect without anyone touching it, and the status shapes what can be repaired, added or rebuilt for as long as the owner holds the property and after it sells.

As of today, October 12, 2026, none of this has been adopted. Everything below describes the draft as published, unless it is identified as current law.

The Proof Sits With the Owner

Under draft Section 9.290.030, the owner has "the burden to prove a legal nonconformity," and must provide evidence "to the satisfaction of the Director." Once a whole new set of standards takes effect, that requirement could reach far more properties than the ones that are nonconforming under today's rules.

The city's own record shows how identification would work. In the comment tracking matrix for the hearing draft, a planning commissioner asked whether the city would notify owners whose properties become nonconforming through a code change, and how an owner would know to tell a future buyer. Staff replied that the city is required to give public notice of code changes but "is not responsible for identifying the extent to which those code changes create nonconformities." The reply adds that an owner would not be required to change existing legal nonconformities, while new development must meet current rules.

The map is still in progress. The draft renames the residential districts to CR, RE, R4.5, R10, R20 and R24. It merges the former R20-L and R20-H into a single R20 and renames Open Space Residential as Conservation Residential. When commissioners asked for a map showing which parcels move into which district, staff said the city "will prepare an updated zoning map with new naming conventions and colors." The matrix marks that item "Deferred." The draft's own text says the Council adopts the zoning map together with the code. The published materials don't say whether the revised parcel-by-parcel version will be ready at these hearings.

A neighborhood example came up in the record. A commissioner noted that Canyon Shores is built at 12.6 dwelling units per acre and would be nonconforming under the draft's density figure. Staff answered that density comes from the 2040 General Plan, and that changing it would take a General Plan amendment, which is outside the scope of this project.

What Nonconforming Status Lets an Owner Keep

The status protects a lot. Under the draft, the right to continue "shall attach to the land and shall not be affected by a change in ownership," so a sale on its own doesn't end it. Structural and nonstructural maintenance, repairs and interior alterations are allowed as long as they don't enlarge the structure, change its footprint or increase its height.

On additions, the draft is more flexible than the current code. Current Section 9.66.050 says a nonconforming structure "shall not be added to or enlarged," and allows structural alterations only if they don't make the nonconformity worse. The draft allows alterations and additions on a property in residential use if the new work meets code. It also lets a nonconforming interior side or rear setback be extended, provided the extension creates no new encroachment into another required setback.

The catch is the first step. A permit for that addition depends on the home's legal status, and the owner is the one who has to show it.

Where the Draft Is More Generous: After Damage

The damage provisions are where the gap between current and draft law is widest. For a homeowner, this is probably the strongest argument that the rewrite improves things.

Scenario Current code, Section 9.66.050 Council Hearing Draft, Section 9.290.060
Structure damaged but not destroyed Work must start within six months and finish within six months after starting, unless the City Planner approves a later time If repair costs 50 percent or less of replacement value, permits within 12 months, diligent completion, no added floor area
Structure destroyed or heavily damaged Rebuild only in compliance with all current regulations Above 50 percent, a residential structure may be rebuilt up to its prior size and unit count, provided the rebuild meets current property development standards; permits within one year
Cause of damage Not specified in this section Applies to fire, explosion, earthquake or natural disaster not caused by an act or deliberate omission of the owner or their agent

Under current law, a destroyed nonconforming structure has to be rebuilt to current regulations, and a damaged one has to have work underway within six months. The draft gives a year to secure permits and, above the 50 percent line, preserves the right to rebuild a residence to its former size. The 50 percent test is measured against replacement value before the damage, or assessed value if replacement value isn't available.

Both paths start from a home recognized as legal nonconforming. That brings the burden-of-proof question back. The documentation that supports the 12-month and rebuild-to-prior-size protections is the same documentation the owner has to supply.

The draft also sets a 12-month clock for nonconforming uses. Once a use stops and any one of five listed events occurs, it cannot be resumed after 12 months. The events are the site being vacated, a business license or permit lapsing, utilities being terminated, a lease ending, or similar evidence of abandonment. Current Section 9.66.030 lets a nonconforming use continue until it is abandoned, with no numeric period in that section.

Walls, Fences and Pools Follow a Stricter Rule

Under the draft, fences and walls eight feet high or less are not "structures." They fall under Section 9.290.070 as site improvements instead. A nonconforming fence may be maintained "until such time as it is destroyed," and a destroyed one may be rebuilt only in compliance with all current regulations. Fences get no 50 percent threshold and no rebuild-to-prior-size allowance.

So for fences, what the city now considers current matters more than the old rule. In residential areas, the draft caps solid front-yard fencing at 42 inches. Open fencing in the front yard can reach six feet, as can side and rear fencing, subject to sight-distance rules at corners. The draft bans chain link, wood other than posts, plywood, barbed and razor wire, electrified materials and used materials. Vinyl was added after a Planning Commission study session request, along with die-cut decorative metal. The required fence modulation was reduced from one foot to six inches after a commissioner called one foot too large.

Pools do count as structures under the draft definitions. The draft keeps pools out of required front setbacks, places them at least three feet from side and rear property lines and from structures, and puts pumps and filters at least five feet from a property line. A five-foot masonry wall can support a reduction approved by the Director. Enclosed detached accessory structures generally need five feet from side and rear lines and ten feet from other structures. Open structures such as gazebos are capped at ten feet high with five-foot setbacks.

The Headline Change That Mostly Isn't New

Short-term rentals usually come up first in any Coachella Valley zoning discussion, so here is where they stand. The draft says an ADU cannot be used as a short-term vacation rental. Current Section 9.114.050 already says an ADU "shall not be utilized as a short-term vacation rental." In the comment matrix, staff declined suggested ADU edits because the direction was to carry over the approved ADU ordinance without further changes. Lots created through an SB 9 urban lot split keep their existing rental limits as well.

Two real changes do give an existing home more room:

  1. A separate path for small detached ADUs. The draft allows one junior ADU plus a detached ADU of up to 800 square feet and/or a conversion ADU. Small detached units need four-foot side and rear setbacks, and the one-space parking rule that applies to larger units isn't imposed on them. Current law generally requires one new space per ADU, subject to listed exemptions.
  2. Looser home-occupation rules. Current Chapter 9.70 bars nonresident employees and allows more than one home business only at the City Planner's discretion, and only for e-commerce. Draft Section 9.115.110 allows one nonresident employee and more than one home occupation. It permits customers between 8:00 a.m. and 6:00 p.m., one per hour plus one in a waiting area, and keeps the 25 percent floor-area cap.

Both changes add value only on a lot whose existing improvements are already documented. The ADU path and the home-business allowances apply to a property whose legal baseline is established.

The rewrite is also happening while other parts of the city are changing. The Ramon Road Bridge project, a partnership of Palm Springs, Cathedral City and the Agua Caliente Band of Cahuilla Indians, is scheduled to begin construction this winter and run about two years. It will widen a bridge that carries more than 40,000 vehicles a day from four lanes to six and connect it to CV Link. Community meetings are set for October 20 at Agua Caliente Elementary School and October 21 at the Boys & Girls Club of Cathedral City.

Frequently Asked Questions

Is the new Development Code in effect? Not as of October 12, 2026. The Council hearings are scheduled for October 14 and October 28, 2026, and NBC Palm Springs reported the hearing schedule when the final draft was released in August.

Does a sale end nonconforming status? Under the draft, no. The right to continue attaches to the land and is unaffected by a change in ownership, unless the Building Official deems the use or structure a public nuisance or a nonconforming use is abandoned.

Where can the full text be read? The project site, zonecathedralcity.com, posts each division of the draft, the EIR addendum and the comment matrix. The current code is published on ecode360.

If you're listing or buying a home in Cathedral City while this code moves through the Council, Scott James Properties can help you pull together the permit history and original approvals for that address before an offer or a listing goes out. Schedule a Free Consultation, or start with a home valuation.

This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.

Work With Us

We pride ourselves in providing personalized solutions that bring our clients closer to their dream properties and enhance their long-term wealth. Contact us today to find out how we can be of assistance to you!

Follow Us